Golshahr- Hashtgerd Tehran metro line 5 extension
planed
Project Specifications
Extension Location: | Tehran metro's line 5 (Golshahr-Hashtgerd) |
Client: | Farab Company |
Type of System: | 2×25 kV Autotransformer |
Length: | 2×26.5 Km |
Speed: | 120 Km/h |
Executive Level: | Design check out, Manufacturing of the fittings |
Type of Agreement: | EPC |
Responsibility: | Overhead network designing, Power network Studies and simulation, design and manufacturing of fittings and equipment, Installation and implementation of network. |